Operations and project footprint

Built around Kailash operations and Simara processing expansion.

Big Plus Minerals connects operating granite extraction with a proposed processing pipeline, giving the company a clearer path from raw material to finished output.

Kailash operations

The operating base for granite extraction.

Kailash, Makwanpur serves as the company’s granite operating base and raw material source. This is the operational foundation of Big Plus Minerals’ present story.

The Kailash site is not just a location reference, it is the working upstream side of a broader mine-to-product business model.

Simara processing plant

Planned as the value-add and finishing stage.

The proposed Simara Special Economic Zone plant is intended to process extracted material, cut slabs, and support finished stone products.

This is a strategic expansion toward industrial scale and better value addition inside Nepal.

Simara should be described as proposed until the facility is formally commissioned.

Mineral interests

Granite is the current focus, with broader resource interests in view.

Granite

Current core operating focus tied to Kailash extraction and future slab processing.

Iron

Project records show iron prospecting interests that support longer-term resource optionality.

Copper

Additional copper prospecting interests reflect a broader strategic mineral outlook.

Field videos

Live operation footage from the Kailash site.

Copper sites

Copper prospecting interests beyond the granite operation.

In addition to its granite focus, Big Plus Minerals also has copper prospecting interests that should be presented as future-facing mineral sites rather than operating mines.

The current public positioning now includes Sabhapokhari, Sankhuwasabha and Burtibang, Baglung as copper-related site references tied to the company’s broader mineral development story.

Granite sample cores

Sample cores that support the material story behind the site.

Drilling and core analysis

Exploratory drilling works documented at Palung, Makwanpur.

Current field documentation shows exploratory drilling works of a granite deposit at Palung for Big Plus Minerals Pvt. Ltd. The visual record includes drilling activity, sample-core analysis, and core boxes from documented depth intervals.

Field image annotations reference exploratory drilling works of a granite deposit at Palung for Big Plus Minerals Pvt. Ltd., including BH01 and documented depth intervals.

Compliance

Company standing supported by registration and project records.

Company incorporation

Big Plus Minerals Pvt. Ltd. is an incorporated private limited company in Nepal.

Tax registration

PAN registration documents are on file and should be published only with cleanly verified details.

Licence-backed records

Internal records support Kailash granite activity and additional prospecting interests tied to the company.

Industry challenges

Mining in Nepal requires realism, discipline, and patience.

Infrastructure constraints

Difficult terrain, transport bottlenecks, and unreliable electricity can slow execution.

Execution gaps

Modern equipment, technical manpower, and strong geological data are not always easy to access.

Approvals and communities

Land-use issues, environmental clearances, and local concerns need careful handling and long-term trust.